Stats
50MW
Installed Capacity
9hr
Storage Time With Molten Salt
2.5 km²
Land Area
390ºC
HTF Fluid
197.5 GWh
Annual Electricity Output

China’s first large commercial parabolic trough CSP plant and one of 20 CSP demonstration projects. It was also the first CSP plant that received a preferential loan from Asian Development Bank.

The plant was connected to the grid successfully in October 2018. Pacific Green Solar Technologies has provided the engineering design of this plant.