Stats
50MW
9hr
2.5 km²
390ºC
197.5 GWh
China’s first large commercial parabolic trough CSP plant and one of 20 CSP demonstration projects. It was also the first CSP plant that received a preferential loan from Asian Development Bank.
The plant was connected to the grid successfully in October 2018. Pacific Green Solar Technologies has provided the engineering design of this plant.